One of the more frustrating realities of commercial construction is the programme dependency on external cladding completion before internal trades can properly start. The building has to be weathertight. On a project with complex cladding systems, long lead times or constrained site access, that dependency can cost weeks.
Technical Specifications
Material
Wind pressure rating
Vapour permeability
Climate zone suitability
Sealing technology
Frame compatibility
Cutting
Fixing
Fire classification
Bushfire suitability
Hardie™ certified use
What RAB™ Board Actually Does
The Construction Programme Case
Internal trades can start earlier
Once RAB™ Board is installed and joints are taped, the building is weathertight. Plumbing, electrical, framing and internal linings can begin regardless of where the external cladding installation is up to, eliminating the sequential dependency that causes programme delays.
Weather doesn't hold up the programme
On a building with a flexible weather-resistant barrier, wind events can lift or tear the wrap, requiring re-fixing and re-inspection before internal trades can enter. RAB™ Board's rigidity means wind and rain don't interrupt the construction sequence.
Complex or long-lead cladding isn't a bottleneck
When the external cladding system has long lead times, complex installation requirements or phased delivery, RAB™ Board allows internal construction to proceed at full pace while cladding proceeds in parallel, not in sequence.
Programme savings are cost savings
Every week saved on programme is a week of site overhead, crane costs, scaffolding costs and financing costs that doesn't need to be paid. On a large commercial project, the programme benefit of the RAB™ Board can justify its cost many times over.