HardieSmart® ZeroLot Wall System
Build Right to the Boundary, Build Independently
Zero-lot developments, where two dwellings share a common boundary line with no setback, solve a genuine land-use problem in established suburbs. But they create a construction sequencing problem: if both dwellings are built with a shared wall, one owner’s build depends on the other’s. Sell one lot before the other is finished, and things get complicated fast.
60/60/60
Fire Resistance Level (minutes)
2.45m²
Extra internal space per dwelling per 10m wall length
CSIRO
Assessed by CSIRO Division of Building Construction & BRANZ
Technical Specifications
Fire Resistance Level
Suitable building class
Frame configuration
Insulation
External cladding
Internal lining
Assessment
Bracing capacity
Applications
NCC reference
Design flexibility
How the System Is Built
The Business Case, Not Just the Compliance Case
Independent construction sequencing
Because each dwelling has its own wall rather than a shared party wall, one dwelling can be completed, sold and occupied while the neighbouring lot is still under construction or hasn't started.
Improved cash flow
Decoupled construction timing means a developer isn't waiting on the slowest-selling or slowest-building lot to close out sales and settlements on the others. For a multi-lot zero-lot development, this can materially change the project's cash flow profile.
More usable floor space than brick veneer
At 2.45 m² of extra internal space per dwelling over every 10 linear metres of wall compared to a standard 230 mm brick-veneer wall, the compact ZeroLot system profile translates directly into saleable or usable floor area, a meaningful yield difference across a full development.
Fully detached title outcomes
Because each wall belongs entirely to one dwelling, ZeroLot supports fully detached construction and title outcomes, as opposed to shared-wall party arrangements that can complicate strata or Torrens title structuring on smaller infill sites.